Project Value: $30,000,000

Ford Motor Company: Kentucky Truck Plant - P558 Super Duty Program - Project Highlights - Stenco Construction - Screen_Shot_2016-03-16_at_11

 

Stenco worked as a general contractor assisting Ford with multiple facility additions. Our scope of work for the MP&L North Expansion, Tailgate Addition and WIP Addition included installation of concrete spread footings, perimeter walls and piers; demolition of the existing wind columns, siding and siding girts; fabrication of new structural steel framing; installation of insulated siding panels; modifications to bituminous roofing; new mechanical piping, HVAC, and electrical systems.

    •  MP&L North Expansion, 10,600 square foot design build addition.
    •  Tailgate Addition, 71,000 square foot addition.
    •  WIP addition, 30,000 square foot design build addition.

The project also included renovations to the Body Shop Locker Room and Gate 12  Parking Lot.

    •  Body Shop Locker Room, interior foundations and fabrication and 
       erection of structural steel, elevated mezzanine and crossover  
       bridge, multiple stairs, and HVAC frame.

    •  Gate 12 Parking Lot, this 400 space parking lot included grading    
       asphalt, new drainage swale, relocating existing lighting, and        
       furnishing and installing new employee turnstile walkway.

37,000 trade hours went into this project with no recordable safety incidences. 

Ford Motor Company: Construction Commodity Management
Johnson Controls, Inc.: Cafeteria Renovation
Toyota Motor Manufacturing Alabama: Pre-Construction & Foundations
Hyundai America Technical Center: Innovation Space
Toledo Public Schools: Interior Renovations
American Axle: Tech Center Office Renovations
Ford Livonia Transmission: South Chiller Building
Marriott Hotels: Renovations
Toyota Tech Center: Powertrain Expansion
Ford Livonia Transmission Plant: Valve Body Assembly Clean Room
St. John Providence Hospital: 5th and 6th Floor Renovations
University of Michigan
Toyota Motor Manufacturing
Nissan Motor Company
MSUFCU
MSUFCU
Fifth Third Bank
Michigan Veterans Foundation
Dykema Gossett PLLC: Dykema Interior Renovation
Toyota Manufacturing: TMMK Body Weld Expansion
Ann Arbor VA Hospital: Renovation
Kingston Residence of Perrysburg
Dearborn Inn: Renovations
Promedica Network, Toledo and Flower Hospitals: Interior Renovation
Wood County Hospital: Oncology Unit
Ford IT Agile: Office Renovations
University of Michigan - Dearborn: Renovations
FCA SHAP Body Shop: Concrete Foundations, Pits, Grade Beam
Milan Middle School: Interior/Exterior Repair
Looking for a top level contractor for your next big interior buildout?
Trust Stenco to deliver the highest in quality and customer satisfaction - on time and on budget.
Request A Bid