Stenco Construction was selected as General Contractor for a 14 Bay Addition at Toyota Motor Manufacturing's West Virginia engine and transmission plant. The plant, established in 1996, represents a total $1.5 billion investment in West Virginia and provides 1,800 jobs to the area.

Project details:

  • Added 50,400 SF of space to the plant
  • Added the 14 bays, a two bay truck dock and a 231,000 SF trailer parking lot

This project was awarded to Stenco after the completion of a 6 bay expansion in the same facility. In all, Stenco will have added 20 bays and a total of 72,000 SF to the plant over the course of 13 months. Throughout this 14 bay addition, Stenco oversaw the entire project, from preconstruction and excavation to building erection and interior finishing. The project has included:

  • 37,000 CY earthwork for the addition, parking lot and ring road
  • 6,110 SY of ring road asphalt paving and 215,000 SF parking lot concrete paving
  • 90 tons of structural and miscellaneous steel
  • Utility installation, including 7,385 LF of fire protection, 2,850 LF of mechanical, 15,000 LF electrical conduit, 16,000 LF of cable tray and 88,000 LF of electrical wire
Ford Motor Company: Construction Commodity Management
Johnson Controls, Inc.: Cafeteria Renovation
Toyota Motor Manufacturing Alabama: Pre-Construction & Foundations
Hyundai America Technical Center: Innovation Space
Toledo Public Schools: Interior Renovations
American Axle: Tech Center Office Renovations
Ford Livonia Transmission: South Chiller Building
Marriott Hotels: Renovations
Toyota Tech Center: Powertrain Expansion
Ford Livonia Transmission Plant: Valve Body Assembly Clean Room
St. John Providence Hospital: 5th and 6th Floor Renovations
University of Michigan
Nissan Motor Company
MSUFCU
MSUFCU
Fifth Third Bank
Michigan Veterans Foundation
Dykema Gossett PLLC: Dykema Interior Renovation
Toyota Manufacturing: TMMK Body Weld Expansion
Ford Motor Company: Kentucky Truck Plant - P558 Super Duty Program
Ann Arbor VA Hospital: Renovation
Kingston Residence of Perrysburg
Dearborn Inn: Renovations
Promedica Network, Toledo and Flower Hospitals: Interior Renovation
Wood County Hospital: Oncology Unit
Ford IT Agile: Office Renovations
University of Michigan - Dearborn: Renovations
FCA SHAP Body Shop: Concrete Foundations, Pits, Grade Beam
Milan Middle School: Interior/Exterior Repair
Looking for a top level contractor for your next big interior buildout?
Trust Stenco to deliver the highest in quality and customer satisfaction - on time and on budget.
Request A Bid